Installing TPO Over Modified Bitumen on Brooklyn Flat Roofs

Installing TPO over modified bitumen is a job BST Roofers does in Brooklyn once a moisture scan and core cut show the old roof is dry and under the code's layer limit. Then the mod-bit stays and the TPO goes on top. Shall we test yours?

Crew rolling a white TPO membrane over an old modified bitumen roof on a Brooklyn flat roof
Before anything goes on

Four tests decide whether the old roof can stay

Covering wet or rotted roofing seals the damage in, so these four tests come first.

  • Moisture scan of the whole field for wet insulation
  • Core cut to count the existing roofs against the building code limit
  • Walking the deck for soft or springy spots
  • Drains, parapet walls and edge metal, checked for drainage and flashing problems
The recover build-up

What sits between the mod-bit and the TPO

Four layers, bottom first.

  1. 01

    Existing modified bitumen

    Left in place as the base.

  2. 02

    Separation layer or cover board

    Usually DensDeck gypsum or high-density polyiso, because asphalt and TPO cannot touch.

  3. 03

    Polyiso or tapered insulation

    Optional, for added R-value or to pitch water toward the drains.

  4. 04

    TPO membrane

    Such as Carlisle Sure-Weld or GAF EverGuard, with heat-welded seams, new flashing and new edge metal.

Four methods

Ways the TPO recover can be built

The roof below decides the method. If the membrane itself is still open, start by weighing TPO against EPDM.

Method When it fits What it adds
01Cover board, mechanically attached TPO
Our usual build on rowhouses and storefronts
Dry roof, sound deck, working drains Quick install, no adhesive
02Cover board, fully adhered TPO Concrete decks, windy exposures Smooth sheet, no fastener rows
03Tapered polyiso, then TPO Water ponds after rain Slope to drains, more R-value
04Partial tear-off, then recover Wet patches in a few spots Wet areas out, dry roof kept

Swipe to see both columns

Why owners choose it

What you gain by keeping the mod-bit

Installing TPO over modified bitumen means nothing comes off. There is no dumpster on the street and no night with the roof open over your brownstone, multi-family or mixed-use building.

The white surface reflects summer sun, so the top floor stays cooler. Seams are welded with hot air instead of torched laps. Insulation can go in at the same time.

Finished white TPO roof over a Brooklyn brownstone, seams welded and edge metal new
The honest case

When we tell you to tear it off instead

Some roofs should not be covered, and we will say so plainly.

  • Wet insulation spread across the roof, well beyond a few patches.
  • Two roofs already on the deck, or decking that sags or has rotted.
  • Drainage that needs rebuilding from the deck up.

Then a full tear-off and new TPO roof is the right job.

FAQ

Your recover questions

01Can TPO go straight onto the old mod-bit with nothing between?

No. Asphalt degrades TPO on contact, so a cover board or separation layer always goes in first.

02Does the manufacturer warranty cover a recover?

Yes, when the work follows the manufacturer's recover specification and passes their inspection.

03Will tenants or the shop below be disturbed?

Very little. The roof is never opened and no torch is used, so the space below stays dry. The fastening drill is the main noise, during working hours.

04How does the cost compare with a tear-off?

It usually costs less, because nothing is removed or hauled away. Size, cover board and insulation set your figure, as what a TPO install costs on a Brooklyn flat roof lays out.

Free estimate

Book the scan and quote for your recover

Would you like your mod-bit roof scanned, cored and quoted in writing for a TPO recover? Call or send the form.

Free roof estimate

Get your Brooklyn roof priced — free

Leave your name, phone and ZIP code and BST Roofers calls you back to set a time to look at your roof.

(929) 295-4523Call for a free estimate
or

We answer calls 24/7 — leaks and storm damage included.